Multifamily Conversions & ADUs · Hamilton
Hamilton Houses Into Two, Three and Four Legal Units
Hamilton's pre-war brick two-storeys were built big, on deep lots, with basements that are almost — but not quite — tall enough. That combination is why the city is where we have done more multi-unit conversions than anywhere else, and why every one of them starts with a tape measure in the basement.
Google 4.9★
164 reviews · 2 locations
HomeStars 5.0★
Consistently, year over year
WSIB + Fully Insured
Your home is protected
25+ Years
Experience in the GTA
Permits Handled
Start to final inspection
What a Hamilton conversion actually involves
A conversion keeps the walls and the roof and changes everything inside them. In our Hamilton project stories that has meant: a full strip of every floor back to brick, block and joists; new partition framing dividing the house into self-contained units, each with its own kitchen, washroom and laundry; fire-rated separations between units and from the common stair; egress windows cut to the size the Building Code requires; and services rebuilt to serve two, three or four households instead of one.
Services are the part people underestimate. One project trenched new underground plumbing through the basement slab to reach the added kitchens, bathrooms and laundries. Another upgraded the water service from the street. The quadplex added three hydro meters and three panels so every unit is metered on its own. None of that is visible when it is finished; all of it is on the permit drawings.
The basement is the whole question
Ontario's rules for a second unit in an existing house allow a basement ceiling of 1.95 metres over the required floor area — about six feet five inches. Many of Hamilton's older basements sit a few inches under that. In our three-unit project story the basement measured five feet eight under the joists, and lifting it to the six-foot-four the inspector needed was done by reworking bulkheads and ducts rather than lowering the floor. Every other decision on that job followed from solving the headroom first.
Where ducts and bulkheads cannot recover the height, the options are lowering the floor by underpinning or benching the foundation — a real structural project — or planning the basement as storage and mechanical space and putting the units on the floors above. We measure to the underside of the joists and to the bottom of the main trunk duct on the first visit, because that number decides whether the basement is a unit or not.
Legal means Building Code, zoning and occupancy — all three
A unit is legal when it satisfies three separate authorities. The Ontario Building Code sets the physical standard: fire separations between units, a compliant exit from each, escape windows, ceiling height, interconnected smoke and carbon monoxide alarms, and ventilation. Hamilton's zoning by-law decides how many units a lot in a given zone may have, where entrances may go, and what parking applies; those rules changed in 2022 and again in 2024, and the current detail is on our Hamilton page. Then the City inspects the work and issues occupancy.
Occupancy can come in parts. On the quadplex, the City signed off the three units inside the house on one occupancy permit and the studio in the detached garage on a second. Planning for that sequence — which units can be occupied while the rest is finished — is part of how the project is scheduled, not an afterthought.
Entrances, and how we sequence the job
Each unit needs its own way in and out, and in a Hamilton two-storey that usually means a new separate entrance to the basement and a rebuilt stair to the upper unit. Hamilton's 2022 zoning amendments limited entrances on the front facade, so the basement door normally goes on the side or the rear; we cut the entrance early — the site work takes three days — so the basement can be worked through it rather than through the house.
The order is the same on every conversion: strip, structure (beams and posts where walls come out), rough-in for plumbing, electrical and HVAC across every unit, fire separation and insulation, inspections, then finish — kitchens, bathrooms, flooring, doors — unit by unit. Where a project story below says a wall came out with an LVL beam, or a staircase was reframed, that is the structure phase. Where it lists three kitchens and three laundries, that is the rough-in phase done properly.
Conversions & ADUs Projects We've Built in Hamilton
All project stories →
Hamilton
Quadplex Conversion in Hamilton
One single-detached house turned into four self-contained legal units — basement, main floor, second floor, and a studio in the detached garage.
Read the story →
Hamilton
Triplex Conversion in Hamilton: One House, Three Legal Units
One house, three legal self-contained units — a full triplex conversion in Hamilton, taken from permit drawings through fire separation to occupancy.
Read the story →
Hamilton
Three-Unit Conversion in Hamilton
A century brick two-storey split into three self-contained units — three kitchens, three laundries, and a basement that had to gain eight inches of headroom first.
Read the story →
Hamilton
Duplex Conversion in Hamilton: Adding a Legal Second Unit
A Hamilton house split into two self-contained dwelling units inside its existing footprint: two kitchens, three washrooms, four walls removed, full fire separation and a new code-sized basement egress window.
Read the story →Conversions & ADUs Questions From Hamilton
How many units can I put in my Hamilton house?
It depends on the zone, the lot and whether the property is on municipal services, and Hamilton changed the rules in 2022 and again in 2024. Our Hamilton page carries the current permissions, by zone, with the by-law cited. What we can say from the projects: Hamilton has approved two-, three- and four-unit conversions of single detached houses on ordinary urban lots, and each one was decided by fire separation, egress, headroom and parking, not by the number itself.
What makes a basement unit legal in Hamilton?
The Ontario Building Code standard, then the City's inspection. In a house more than five years old the Code's second-unit provisions apply: a 1.95-metre ceiling over the required floor area, a fire separation between the unit and the rest of the house, a compliant exit and escape windows, interconnected smoke and carbon monoxide alarms, and its own kitchen and bathroom. The zoning has to permit the unit on that lot, and the City issues occupancy after inspection. Fire Code retrofit rules apply instead to units that existed before 1994.
Do the units need separate hydro meters?
Not to be legal, but most landlords want them so tenants pay their own electricity. Adding meters means new panels and a service upgrade coordinated with the utility, which is done during rough-in. Our Hamilton quadplex added three meters and three panels, one per additional unit; the water service and gas are usually left shared with the cost split by lease.
My basement ceiling is too low. Is a unit impossible?
Not necessarily. First we check whether the height is lost to ducts and bulkheads rather than the joists themselves — in one Hamilton project reworking the ductwork lifted the clearance from five-eight to six-four. If the joists themselves are too low, the floor can be lowered by underpinning or benching the foundation, which is structural work with its own engineering and permit. If neither makes sense, the basement becomes storage and mechanical, and the units go above.
Does each unit need its own entrance?
Each unit needs its own compliant exit, and a separate exterior entrance is the cleanest way to provide one. The Building Code also accepts a shared exit that is fire-separated from every unit with interconnected alarms. In practice the basement unit gets a new side or rear entrance — cut in three days — and the upper units share a rated common stair. Hamilton's 2022 zoning amendments limited entrances on the front facade, which is why the new door normally goes on the side.
How long does a multi-unit conversion take?
It is a project measured in months, and the length is set by three things: how much structure changes (walls out, stairs reframed), how much service work there is (new plumbing runs, hydro service, water service), and permit and inspection timing with the City. We give a phased schedule at quote stage built from those items, and we sequence occupancy so finished units can be rented while the last one is completed where the City allows it.
What does the City inspect, and when is it 'done'?
Hamilton inspects at the stages the permit sets out — footings or slab work where there is any, framing, insulation and vapour barrier, plumbing and HVAC rough-in, fire separations, and final — and the Electrical Safety Authority inspects the electrical separately. The project is done when the City issues occupancy for the units, which can happen in stages: our quadplex received one occupancy permit for the three units in the house and a second for the garage studio.
Can you convert a house I have not bought yet?
We can look at it with you before you close. The things that decide a conversion — basement headroom, the zone, the lot's parking, where an entrance can go, the state of the foundation and services — can all be checked at a viewing or from the listing and the City's mapping. That read is free and it has saved buyers from houses that were never going to carry the units they were priced on.
- Everything we do in this city: Hamilton — rules, permits and neighbourhoods.
- The service across the GTA: Multifamily Conversions & ADUs.
What Hamilton Homeowners Say
Google 4.9★ (164 reviews across our Milton & Mississauga locations) · Consistently 5.0★ on HomeStars
“Very honest and upfront with the scope of work and pricing. Hard to find this in the construction space. Best part was that they were on time and on budget. Highly recommend!”
“They finished our unfinished basement to a legal apartment. … They were very responsive and their communication was excellent, which I appreciated. The work was done very well and the quality was impressive.”
“From taping off the rest of our home to help eliminate dust and the thorough follow up at the end… They were professional, reliable and most importantly they delivered on time.”
Get a Free Conversions & ADUs Quote in Hamilton
Tell us about your project — we reply within one business day. Or call905-749-4608.