Home Additions — More House, Same Address
Rear extensions, second-storey additions, and in-law suites — engineered, permitted, and built from foundation to finish by one accountable team.
Google 4.9★
164 reviews · 2 locations
HomeStars 5.0★
Consistently, year over year
WSIB + Fully Insured
Your home is protected
25+ Years
Experience in the GTA
Permits Handled
Start to final inspection
How an Addition Comes Together
- 1
Feasibility & Design
We check zoning setbacks and coverage for your lot, then work with designers and engineers on drawings that the city will approve and you can afford to build.
- 2
Permits & Foundation
Building permit, excavation, footings, and foundation — inspected at every required stage, tied properly into the existing structure.
- 3
Frame to Finish
Framing, roof, windows, mechanical rough-ins, insulation, drywall, and finishes — one schedule, one project lead, closed permits at the end.
Why Build Your Addition with HMH
Foundation Experience
A quarter century of excavation, underpinning, and foundation work — the same expertise behind our separate-entrance specialty.
Weather-Tight Fast
We sequence the build to close in the shell quickly, protecting your existing home while interior work continues.
One Fixed Contract
Design, permits, structure, and finishes under one fixed-price contract — not a chain of subcontractors pointing at each other.
Projects We've Built
Oakville
Two-Storey Addition in Oakville
The old attached garage came down and a two-storey addition went up in its place, on a new poured-and-block foundation — with the rest of the house renovated around it.
Read the story →Toronto
Bungalow Raised to a Two-Storey in Scarborough
The roof came off and a full second storey went on — same foundation, same footprint, twice the house.
Read the story →Home Addition Questions
How much can I add to my house?
It depends on your lot's zoning — coverage, setbacks, and height limits vary by municipality. We check feasibility for free before you spend anything on drawings.
How long does an addition take?
Design and permits typically run two to four months depending on the municipality; construction of a typical rear addition runs three to five months after that.
Can we live in the house during construction?
Usually yes. We keep the existing house sealed off and weather-tight, and schedule the messiest tie-in work in short, planned windows.
Do you handle the engineering?
Yes — we bring the structural engineer, coordinate the drawings, and build to them. Engineering review is part of every addition quote.
What GTA Homeowners Say
Google 4.9★ (164 reviews across our Milton & Mississauga locations) · Consistently 5.0★ on HomeStars
“…they completed the entire project including the extension of the living space by 700 sqft, upgrading four washrooms, a completely new kitchen, exterior brickworks, new flooring, new HVAC and Plumbing within five months.”
“They delivered the project on time and within budget, and were very accommodating with a few additional requests we made along the way.”
“Very honest and upfront with the scope of work and pricing. Hard to find this in the construction space. Best part was that they were on time and on budget. Highly recommend!”