HMH Construction — Masters of Renovation

Project story · Hamilton

Three-Unit Conversion in Hamilton

A century brick two-storey split into three self-contained units — three kitchens, three laundries, and a basement that had to gain eight inches of headroom first.

The Hamilton brick two-storey from the street before conversion, the house that became three self-contained units
The Hamilton brick two-storey from the street before conversion, the house that became three self-contained units

Three units in an existing brick two-storey. The basement was the whole question: at 5'8" under the joists it was several inches short of what the Code needs for a legal unit, and every other decision on the job followed from solving that.

What the project had to achieve

The house already had the footprint for three units — it just had a layout, a staircase and a basement ceiling that did not suit any of them. The owner wanted three rentable addresses without adding a square foot to the building.

Project goals here are read from the signed scope of work. We don't publish our clients' names, addresses, or anything they told us in confidence.

Scope of work

How it was built

  1. January 2023

    What we started with

    A brick two-storey with a carport down one side and an exterior wooden staircase bolted to the back for second-floor access. Inside, one staircase served the whole house — the first thing that had to change if three units were going to work.

    The side of the house and carport before work startedThe original exterior wooden staircase at the rear, the only second-floor accessThe original interior staircase before demolition
  2. March – June 2023

    Back to masonry and joists

    Two kitchens, two washrooms, a fireplace, the flooring and the staircase all came out. Stripping to the brick and the joists is what makes a three-way split possible — it lets the new layout sit where the services need to run rather than where the old walls happened to be.

    Disposal bin on the driveway at the start of demolitionDemolition debris staged under the carport for removalMain floor stripped back to bare masonry and ceiling joistsSecond floor stripped out, showing the original wall construction
  3. June 2023

    Finding eight inches in the basement

    This is the measurement the whole job turned on. A tape to the underside of the basement joists read about 5'8" — short of the 6'4" clearance a legal unit needs. Rather than lower the floor, the ducting and bulkheads were reworked and rerouted to claim the height back from the ceiling.

    Tape measure held to the underside of the basement joists showing the original ceiling clearanceDuctwork rerouted through the basement ceiling to recover headroom
  4. June 2023

    Three sets of services

    Three units means three kitchens and three laundries, so the drain and supply runs were rebuilt through the basement and up through the new partitions before anything got closed in.

    New drain and supply lines run through the basement wallNew partition framing with plumbing and electrical rough-in running through itRear elevation during the build, with the old exterior staircase still in place
  5. December 2023 – February 2024

    Main floor unit

    The main floor reads as one long open run from the entry through to the kitchen — quartz counters, wood-tone lowers against white uppers, and its own laundry tucked off the hall.

    Finished front entry of the main floor unit with new door and plank flooringOpen living space of the main floor unit looking through to the kitchenMain floor kitchen with quartz counters, wood-tone lowers and stainless appliancesCompleted bathroom with tiled shower, glass panel and LED mirrorStacked laundry in its own closet off the hallway
  6. December 2023 – February 2024

    Basement unit — the one that needed the headroom

    The unit that started the job. With the ceiling clearance solved, the basement carries a full kitchen and an open living area with proper daylight from the enlarged openings.

    Basement unit kitchen with full-height cabinets and stainless appliancesBasement unit living area with pot lights and plank flooring
  7. December 2023 – February 2024

    Second floor unit

    Upstairs the sloped ceilings were kept and worked around rather than boxed out, so the unit reads larger than its footprint. Its own kitchen, its own bathroom, its own laundry.

    Second floor kitchen with island, quartz counters and stainless appliancesSecond floor living space with sloped ceiling and electric fireplaceSecond floor bathroom with glass shower and vanityNew staircase and landing serving the separated upper unit

The result

Three self-contained units — each with its own kitchen, bathroom and laundry — inside the original brick envelope.

Questions about projects like this

My basement ceiling is too low for a legal unit. Is that the end of it?

Usually not. There are two ways to gain height — take it off the ceiling or take it off the floor. Rerouting ducts and reworking bulkheads is far cheaper than underpinning or lowering a slab, and on this project it was enough to get from 5'8" to the 6'4" clearance the Code wanted. We measure to the underside of the joists and to the bottom of the main trunk duct on the first visit and tell you which route your basement needs.

Do all three units need separate laundry?

Not by Code, but it is what makes units genuinely independent and it is what tenants expect. On this project each unit got its own — which meant three sets of drain, supply and vent runs rather than one.

What has to be fire-rated in a three-unit conversion?

The separations between units and around the utility room. Here that meant fire-resistant board to the utility room, Rockwool Safe'n'Sound in the mechanical and stair walls, and a sprinkler and furnace alarm in the utility room — all inspected before anything was closed in.

How long does a conversion like this take?

This one ran about ten months from first demolition to finished units. A straightforward basement apartment is much faster; three units means three of everything, and each set of services has to be roughed in and inspected before the next trade can move.