HMH Construction — Masters of Renovation
The finished two-storey home from the street, stucco exterior with black trim and a new driveway

Second Storeys · Bungalow Top-Ups · GTA

Twice the House on the Same Footprint

A second storey adds the space of a new home without giving up the lot, the neighbourhood or the yard. The work is structural first and cosmetic last — and the order it happens in is what protects the house.

Bungalow-to-two-storey project story from Scarborough

Three Ways to Go Up

Full second storey

The roof comes off and a complete new level goes on over the whole footprint. The biggest gain in space, and the one that most changes how the house reads from the street.

Partial second storey

A new level over part of the house — typically the bedroom wing — leaving a single-storey section and its roofline in place. Less structure to carry, and sometimes the way to stay inside a height or coverage limit.

Second storey plus rear addition

Going up and out in one project, on one permit and one mobilization, when the main floor needs more room as much as the bedrooms do.

Which one fits is decided by the foundation, the zoning and what you actually need upstairs — in that order.

How a Second Storey Actually Goes On

  1. 1

    Can the house carry it?

    Before any drawing, a structural engineer looks at the foundation walls, the footings and the bearing walls, and opens up what needs opening up. Many 1950s-to-1970s bungalows were built with enough foundation for another floor; some need footings enlarged or walls reinforced first. That answer sets the budget and the design.

  2. 2

    Design, zoning and permit

    Height, lot coverage, setbacks and any mature-neighbourhood rules come from your municipality — several around the GTA cap what a second storey can be. We design inside those limits or take the variance route when it is the right call, then prepare the permit set: architectural, structural and mechanical.

  3. 3

    Roof off, floor on, roof back

    This is the part that has to be fast and has to be planned. The existing roof is stripped, a new floor system is framed over the original walls, the second storey is framed and sheathed, and the new roof goes on. The house is protected at every stage so weather never reaches the main floor.

  4. 4

    Stairs, services and tie-ins

    A new staircase is the largest layout decision on the main floor. Plumbing stacks, ducts and wiring are extended, and the heating and cooling system is checked for the added load. The new exterior is finished to match the original or to contrast with it deliberately — a brick match on an older house is rarely exact, so the cladding decision is made early.

What Is Included

One contract from the first structural visit to the final inspection.

Structural engineering

Foundation and bearing assessment, beam and floor-system design, and the engineer's reviews during construction that the permit requires.

Permits and inspections

Zoning review, the building permit application and every inspection through to final. If a minor variance is needed, we prepare it and present it.

Weather protection

Tarps and temporary roofing are not an afterthought — they are on the schedule, with the roof-off window kept as short as the framing allows.

Mechanical and electrical

Heating and cooling capacity checked against the new floor area, panel capacity confirmed, and services extended to every new room.

Exterior and roofing

New roof framing, sheathing and shingles; cladding, soffits, eavestrough and windows for the new level, tied into the existing envelope.

Interior finish

Insulation, drywall, flooring, trim, doors, the new bathroom or ensuite, and the staircase — finished to the standard of the rest of the house.

Second storeys we've built

Projects We've Built

All project stories →

Second-Storey Addition Questions

Can my bungalow take a second storey?

Often, yes — but only an engineer's assessment can say so for your house. Foundation walls, footing size and soil, and which interior walls are bearing decide it. Post-war bungalows frequently have the capacity; where they fall short, footings can be enlarged or walls reinforced before the addition, and that work is priced into the project rather than discovered halfway through.

Do I need a permit for a second-storey addition?

Yes, always. It is a structural addition and a change to the height and area of the house, so it needs a building permit with architectural, structural and mechanical drawings, and it has to comply with your municipality's zoning for height, lot coverage and setbacks. Several GTA municipalities have mature-neighbourhood rules that limit second storeys specifically — check your city's page on this site, or ask us to check the zoning before you commit to a design.

How long does a second-storey addition take?

Design and permits typically take two to four months depending on the municipality, and construction of an addition typically runs three to five months after that. The roof-off period inside that schedule is measured in days, not weeks, because it is planned around the framing crew and the weather forecast.

Can we live in the house during the work?

Usually not during the structural phase. With the roof off and the floor system going in, the house has no ceiling and no services for a period, and the safest and fastest approach is an empty house. Some partial second storeys can be built with the family in the untouched half; we tell you honestly which kind of project yours is.

Second storey or rear addition — which is better?

It depends on what your lot and zoning give you. A rear addition uses yard and counts against lot coverage; a second storey uses height and keeps the yard. On a narrow urban lot the second storey is often the only way to double the space; on a wide suburban lot a rear addition may be simpler and cheaper to build. Where both are possible, the deciding factor is usually which rooms you need more of.

Where does the staircase go?

That is the main-floor decision that shapes everything else, and we settle it at design stage. The Ontario Building Code sets the rise, run, headroom and width, and the stair has to land somewhere that does not wreck the main-floor plan. A well-placed stair often improves the main floor; a badly placed one is the most common regret in a top-up.

Will the new storey match the old house?

Only if you want it to, and only some materials can. Matching forty-year-old brick is rarely exact, so many second storeys are finished in stucco, siding or panel as a deliberate contrast, with the original brick kept on the ground floor. The Scarborough bungalow in our project stories took that approach with stucco and black trim. Either way the roofline, windows and trim are designed so the house reads as one building.

Does the furnace and electrical need to be upgraded?

Frequently. Doubling the conditioned floor area changes the heating and cooling load, and the mechanical design in the permit set will show whether the existing furnace and air conditioner can carry it or whether a larger unit or a second zone is needed. The electrical panel is checked the same way, and any upgrade is done under an Electrical Safety Authority permit.

Get a Second-Storey Quote

Tell us the age of the house and where it is. We will check the zoning and tell you whether an engineer's visit is the right next step.

Tell us about your project — we reply within one business day. Or call905-749-4608.

Prefer to talk it through?Call 905-749-4608— we pick up.

Tap to CallGet a Free Quote