
Countertops Templated Tight and Installed Right
Quartz, granite, and porcelain surfaces — digitally templated, fabricated to fit, and installed with clean seams, solid support, and properly mounted sinks.
Google 4.9★
164 reviews · 2 locations
HomeStars 5.0★
Consistently, year over year
WSIB + Fully Insured
Your home is protected
25+ Years
Experience in the GTA
Permits Handled
Start to final inspection
How Countertops Get Done
- 1
Material & Quote
Pick your slab — quartz, granite, or porcelain — with our supplier pricing, and get a fixed quote including templating, fabrication, and install.
- 2
Template & Fabricate
Digital templating after cabinets are set, then precision cutting and edge profiling at the fabricator — seams planned where they disappear.
- 3
Install & Connect
Counters set level and supported, undermount sinks bonded and clipped, faucet holes drilled clean, and plumbing reconnected — usually one day.
Why HMH for Countertops
Part of the Whole Kitchen
We install counters as part of full kitchen renovations weekly — cabinets, plumbing, and backsplash coordination is built into the process.
Seams Where They Belong
Layout planning puts seams at sink cut-outs or low-visibility runs, matched for pattern and polished flush.
Supplier Pricing
Years of volume with quartz and stone fabricators means better slab pricing and faster turnaround than walk-in retail.
Projects We've Built
All project stories →Hamilton
Triplex Conversion in Hamilton: One House, Three Legal Units
One house, three legal self-contained units — a full triplex conversion in Hamilton, taken from permit drawings through fire separation to occupancy.
Read the story →Hamilton
Duplex Conversion in Hamilton: Adding a Legal Second Unit
A Hamilton house split into two self-contained dwelling units inside its existing footprint: two kitchens, three washrooms, four walls removed, full fire separation and a new code-sized basement egress window.
Read the story →Mississauga
Open-Concept Kitchen in Mississauga: Removing a Load-Bearing Wall
A Mississauga main-floor renovation: taking out a load-bearing wall with a recessed LVL beam to merge the kitchen and TV room into one open space. Currently in construction.
Read the story →Recent HMH Projects
Real photos from completed HMH Construction jobs across the GTA.



Countertop Questions
Quartz, granite, or porcelain?
Quartz is the low-maintenance default; granite brings natural pattern and takes heat well; porcelain is thin, hard, and great for contemporary looks. We will walk you through samples.
How long from template to install?
Typically five to ten business days after templating, depending on the fabricator and material. Install itself is usually done in a day.
Can you replace counters without changing cabinets?
Yes — if the cabinets are sound and level, counter-only swaps are quick. We check support and add reinforcement where needed.
Do you handle the sink and faucet hookup?
Yes — undermount sink bonding, faucet drilling, and full plumbing reconnection are included in our installs.
What GTA Homeowners Say
Google 4.9★ (164 reviews across our Milton & Mississauga locations) · Consistently 5.0★ on HomeStars
“Very honest and upfront with the scope of work and pricing. Hard to find this in the construction space. Best part was that they were on time and on budget. Highly recommend!”
“HMH renovated our entire kitchen and tiling. They did an excellent job. They promised to have everything done under 3 weeks and they lived up to it.”
“They delivered the project on time and within budget, and were very accommodating with a few additional requests we made along the way.”
Get a Countertop Quote
Tell us about your project — we reply within one business day. Or call905-749-4608.
Prefer to talk it through?Call 905-749-4608— we pick up.